Benang trucks, excavators, a drill rig and crews set out on red earth in front of a power substation

What we do.

End to end critical infrastructure, from design to decommissioning, for the industries Australia relies on.

Water Infrastructure.

End to end water infrastructure.

End to end water infrastructure, from mains and pipelines to water treatment, sewer and drainage. We design, build, cut over and maintain on live networks across Western Australia, keeping customers on supply throughout.

Excavator lifting a 500mm OD MSCL pipe string into position at Medina

What we deliver

  • Water mains and pipelines

    Mains from DN80 to DN630 by open cut and HDD, metro renewals and regional pipelines.

  • Water treatment

    Wastewater and water treatment plant upgrades, pump stations and associated works.

  • Sewer and drainage

    Deep sewer, gravity and pressure mains, and stormwater drainage.

  • Dams, ponds and reservoirs

    Civil works, remediation and lining for potable water storage.

  • Connections and cutovers

    Service connections and planned shutdown cutovers on the live network.

  • Maintenance and repair

    Planned and reactive works that keep the network running.

Drone view of the cleared and levelled Butler subdivision site beside the rail line and a main road, with plant working across the pad

DevelopmentWA

Butler Civil Works, Lot 1757 Fintona Crescent

Aerial view of the North Lake Grace tank site and fill point beside the highway among wheatbelt paddocks

Water Corporation

North Lake Grace Tanker Fill Point

Water Corporation and Benang crew at a Metro water pipe renewal project site

Water Corporation

Metro Water Reticulation Renewals, Package 2

Benang crew guiding a pipe section on slings toward the trench, with a loader and an excavator, on the Kojonup to Katanning pipeline

Water Corporation

Kojonup To Katanning Pipeline

Excavator lifting a 500mm OD MSCL pipe string into position at Medina

Water Corporation

HLZ Pipeline 500mm OD MSCL

Excavator placing geofabric and blockwork across the effluent storage pond floor at Hyden

Water Corporation

Hyden Wastewater Treatment Plant Upgrade

Excavator laying the new water main in an open trench through Narembeen farmland

Water Corporation

Farmlands Pipe Replacement, Narembeen

Gate valve and 630mm pipe assembly lifted on slings for the Mirrabooka cutover

Water Corporation

630mm Pipeline Cutover, Mirrabooka

Power Infrastructure.

HV and LV infrastructure, substations and overhead to underground conversions.

End to end power infrastructure on the live network, from design support and cable installation through testing, commissioning and handover. More than 100 Western Power network projects delivered, across 250 plus outages with none missed.

Two Benang workers laying orange cable protection over the trench inside the live Western Power substation at Henderson

What we deliver

  • HV and LV infrastructure

    High and low voltage cable installation by trenching, dry-vac excavation and HDD.

  • Substations

    Kiosk and zone substation construction, connections and maintenance.

  • Overhead removal

    Overhead to underground conversions and decommissioning of existing assets.

  • Street lighting

    Street and public lighting installation and upgrades.

  • Testing and commissioning

    Testing, commissioning and energisation around planned outages.

  • Renewable power

    Power systems and connections for renewable and remote sites.

Drone view of the cleared and levelled Butler subdivision site beside the rail line and a main road, with plant working across the pad

DevelopmentWA

Butler Civil Works, Lot 1757 Fintona Crescent

Two Benang workers laying orange cable protection over the trench inside the live Western Power substation at Henderson

Western Power

HV Cable Into A Live Substation, Henderson

A green high voltage kiosk substation being craned onto its concrete plinth at Morley Road, Bullsbrook

Western Power

End-to-End Power Connection, Bullsbrook

A high voltage transmission tower at dusk with glowing orange power lines streaming from it

Western Power

Western Power Network Support Services

Benang directional drilling truck with conduit ducts on the Rottnest Island power upgrades

Rottnest Island Authority

Rottnest Island Power Upgrades

Generator and trenched conduit runs on the low voltage power installation at Cloudbreak

Fortescue, via TCD Civil Construction

Chichester Bigge Farewest LV, Cloudbreak

Prefabricated data centre building craned into position at Solomon Hub

Fortescue

Solomon Data Centre

Gas Pipeline Infrastructure.

Gas mains, live insertions, connections and maintenance.

End to end gas pipeline infrastructure in live metro road reserves, in partnership with ATCO since 2021. More than 5,000 live gas insertions delivered across our ATCO programs.

Trenching for the new gas mains near the racecourse

What we deliver

  • Gas main installation

    New and replacement gas mains by open trench and HDD.

  • Live insertions

    Main and service replacement while the network stays live.

  • Service connections

    Residential and commercial connections to the gas network.

  • Maintenance and emergency response

    Planned maintenance and rapid response on the live network.

  • Commissioning and reinstatement

    Testing, purging, commissioning and full surface reinstatement.

Gas blending skid with yellow pipework and pressure vessels at an ATCO facility

ATCO

Project Moorditj Gas Infrastructure Program

White Benang vacuum excavation truck parked on a gravel yard

ATCO

Leach Highway and North Lake Road HDD

Traffic managed ATCO gas works on a Perth street

ATCO

ATCO Maintenance And Project Services

Trenching for the new gas mains near the racecourse

Utilities

Racecourse Gas Main Installation, Belmont

Fabrication & Maintenance.

Coded piping, structural steel and maintenance from our Bibra Lake workshop.

Coded piping and structural steel fabricated, tested and supplied from our Bibra Lake workshop, then installed and maintained on site. Built to ASME IX and AS 4041, with NATA-certified testing and rapid mobilisation for shutdowns.

Benang welder in hi-vis and helmet welding a carbon steel pipe spool with yellow-painted flanges in the Bibra Lake workshop

What we deliver

  • Coded piping

    Carbon steel, stainless, duplex, super duplex and CuNi spools to ASME IX and AS 4041.

  • Structural steel

    Fabricated, painted and galvanised structural steel packages.

  • Testing and quality

    NATA-certified NDT and hydro testing, with full weld procedure records.

  • Site installation

    Installation, tie-ins and commissioning on site.

  • Maintenance and shutdowns

    Planned and reactive maintenance and shutdown support, onshore and offshore.

Copper nickel pipe spools with flanged risers strapped to a timber pallet for delivery

Vermilion Energy

CuNi Pipe Spools

Hot-dip galvanised pipe spools with bolted end flanges ready for dispatch

TCD

Galv Pipe Spools

Coated carbon steel spool strapped to a pallet for transport

Fortescue

Painted Piping With C18 Epoxy Novolac Coating

Carbon steel pipe spools with gold flanges on jack stands in the Benang workshop

Beach Energy

Painted Pipe Spools And Galv Structural Steel

Stainless duplex pipe spools with flanged ends strapped into a blue transport crate at the Benang workshop

Vermilion Energy

Duplex And Super Duplex Piping

Civil Infrastructure.

Earthworks, remediation, deep sewer and culverts.

End to end civil infrastructure, from site establishment and earthworks to drainage, remediation and reinstatement. Delivered beside live rail, highways and residents, and as head contractor for DevelopmentWA.

Geocell slope protection and a precast concrete drainage pit below the security fence at the Melville reservoir site

What we deliver

  • Earthworks

    Clearing, bulk and detailed earthworks for construction-ready sites.

  • Roads and intersections

    Road and intersection works under traffic management.

  • Drainage and culverts

    Stormwater drainage, main drain upgrades and culverts in live corridors.

  • Dams and reservoirs

    Dam civil works and reservoir remediation.

  • Deep sewer

    Deep sewer construction for land development.

  • Decommissioning and remediation

    Removal of redundant assets and full site reinstatement.

Drone view of the cleared and levelled Butler subdivision site beside the rail line and a main road, with plant working across the pad

DevelopmentWA

Butler Civil Works, Lot 1757 Fintona Crescent

Freshly sealed new slip lane along Nicholson Road marked with traffic cones and barriers, beside bushland

11 Acre Farm

448 Nicholson Road Intersection

Aerial view of the North Lake Grace tank site and fill point beside the highway among wheatbelt paddocks

Water Corporation

North Lake Grace Tanker Fill Point

Aerial view of the Lot 29 earthworks at The Parkway, Ellenbrook, with stripped ground, a sand haul road and Benang machines at work

DevelopmentWA

The Parkway Earthworks, Ellenbrook

Prefabricated data centre building craned into position at Solomon Hub

Fortescue

Solomon Data Centre

Benang operator servicing dewatering plant on a Fortescue Pilbara site

Fortescue, via TCD Civil Construction

Fortescue Civil & Dewatering

Fencing extension and bollards along the northern bank at Herdsman Lake

Water Corporation

Herdsman Lake Civil And Drainage

The upgraded main drain corridor at Gwelup

Utilities

Main Drain Upgrade, Gwelup

Industry

Utilities.

End to end water, power and gas infrastructure for the asset owners who hold it.

Water, power and gas infrastructure delivered directly for Western Australia's utility asset owners, on panels and long-term programs with Water Corporation, Western Power and ATCO.

Benang excavator parked beside a precast concrete chamber on the Kojonup to Katanning pipeline

What we deliver

  • Water networks

    Mains, pipelines, treatment and drainage for Water Corporation.

  • Power networks

    HV and LV cabling and substations under Network Support Services for Western Power.

  • Gas networks

    Gas mains, insertions and connections for ATCO, including Project Moorditj to 2028.

  • Island and regional networks

    Upgrades for remote communities and island infrastructure.

Two Benang workers laying orange cable protection over the trench inside the live Western Power substation at Henderson

Western Power

HV Cable Into A Live Substation, Henderson

A green high voltage kiosk substation being craned onto its concrete plinth at Morley Road, Bullsbrook

Western Power

End-to-End Power Connection, Bullsbrook

Aerial view of the North Lake Grace tank site and fill point beside the highway among wheatbelt paddocks

Water Corporation

North Lake Grace Tanker Fill Point

Gas blending skid with yellow pipework and pressure vessels at an ATCO facility

ATCO

Project Moorditj Gas Infrastructure Program

White Benang vacuum excavation truck parked on a gravel yard

ATCO

Leach Highway and North Lake Road HDD

A high voltage transmission tower at dusk with glowing orange power lines streaming from it

Western Power

Western Power Network Support Services

Water Corporation and Benang crew at a Metro water pipe renewal project site

Water Corporation

Metro Water Reticulation Renewals, Package 2

Benang directional drilling truck with conduit ducts on the Rottnest Island power upgrades

Rottnest Island Authority

Rottnest Island Power Upgrades

Industry

Mining & Resources.

Non-process infrastructure, civil, electrical and fabrication for operating sites.

Non-process infrastructure and sustaining capital for operating mine sites, from civil and dewatering works to site electrical, data centre builds and coded fabrication. Delivered FIFO to remote sites across Western Australia.

Prefabricated data centre building craned into position at Solomon Hub

What we deliver

  • Non-process infrastructure

    Civil, electrical and mechanical works that keep an operating site running.

  • Civil and dewatering

    Site dewatering and civil infrastructure on operating mine sites.

  • Site electrical

    Low voltage distribution, pit and pipe works and data centre builds.

  • Fabrication for site

    Coded piping and structural steel supplied from Bibra Lake.

  • Remote delivery

    Crews and plant mobilised FIFO, with heritage and land access compliance.

Hot-dip galvanised pipe spools with bolted end flanges ready for dispatch

TCD

Galv Pipe Spools

Coated carbon steel spool strapped to a pallet for transport

Fortescue

Painted Piping With C18 Epoxy Novolac Coating

Generator and trenched conduit runs on the low voltage power installation at Cloudbreak

Fortescue, via TCD Civil Construction

Chichester Bigge Farewest LV, Cloudbreak

Prefabricated data centre building craned into position at Solomon Hub

Fortescue

Solomon Data Centre

Benang operator servicing dewatering plant on a Fortescue Pilbara site

Fortescue, via TCD Civil Construction

Fortescue Civil & Dewatering

Industry

Oil & Gas.

Dedicated coded fabrication for oil and gas, from our Bibra Lake workshop.

Dedicated fabrication for the oil and gas sector. Duplex, super duplex, CuNi and carbon steel piping and structural steel, fabricated, tested and supplied from our Bibra Lake workshop for operators including Vermilion Energy and Beach Energy.

Carbon steel pipe spools with gold flanges on jack stands in the Benang workshop

What we bring to oil and gas

  • Coded fabrication

    Pipe spools and structural steel to ASME IX, ASME B31.3 and AS 4041.

  • Specialist materials

    Duplex, super duplex, CuNi, galvanised and coated carbon steel.

  • Testing and certification

    NATA-certified NDT and hydro testing with full traceability.

  • Shutdown support

    Rapid mobilisation for shutdowns and maintenance, onshore and offshore.

Copper nickel pipe spools with flanged risers strapped to a timber pallet for delivery

Vermilion Energy

CuNi Pipe Spools

Carbon steel pipe spools with gold flanges on jack stands in the Benang workshop

Beach Energy

Painted Pipe Spools And Galv Structural Steel

Stainless duplex pipe spools with flanged ends strapped into a blue transport crate at the Benang workshop

Vermilion Energy

Duplex And Super Duplex Piping

Industry

Land Development.

Earthworks, drainage and servicing that turn raw land into construction-ready sites.

From raw ground to a serviced site. Earthworks, drainage, roads and the water, sewer and power servicing that follows, delivered by one contractor and as head contractor for DevelopmentWA.

Excavated culvert extension beside the live Brand Highway with traffic management in place

What we deliver

  • Site establishment and earthworks

    Clearing, bulk and detailed earthworks to a construction-ready pad.

  • Roads and intersections

    Access roads and intersection upgrades under traffic management.

  • Drainage and culverts

    Stormwater drainage and culvert construction.

  • Water, sewer and power servicing

    Utility servicing installed by the same crews that build for the asset owners.

Drone view of the cleared and levelled Butler subdivision site beside the rail line and a main road, with plant working across the pad

DevelopmentWA

Butler Civil Works, Lot 1757 Fintona Crescent

Freshly sealed new slip lane along Nicholson Road marked with traffic cones and barriers, beside bushland

11 Acre Farm

448 Nicholson Road Intersection

Aerial view of the Lot 29 earthworks at The Parkway, Ellenbrook, with stripped ground, a sand haul road and Benang machines at work

DevelopmentWA

The Parkway Earthworks, Ellenbrook

Excavated culvert extension beside the live Brand Highway with traffic management in place

Land Development

Brand Highway Culvert And Drainage Works

Industry

Defence.

Accredited crews ready for defence estate and infrastructure work.

Accredited, certified and ready for work on the Defence estate. The water, wastewater, power, gas and civil services bases depend on, plus the safe decommissioning of redundant infrastructure, from one accountable delivery partner.

Benang crew running a pre-start briefing around the utes before work begins on a remote site

What we bring to defence

  • Critical base infrastructure

    Water, wastewater, power, gas and civil works, built and maintained by our own crews.

  • Commonwealth ready

    OFSC accredited, with ISO 9001, 14001 and 45001 certified management systems.

  • Decommissioning and remediation

    Safe removal of redundant assets, from isolation and demolition to site remediation.

  • Indigenous participation

    Aboriginal-owned and Supply Nation certified, supporting Indigenous procurement outcomes.

One delivery partner for your next project.

Benang can bring any of these capabilities to your project, alone or combined through one accountable delivery partner. Get in touch to discuss your next build.

Contact us