Aerial view of bulk earthworks at The Parkway, Ellenbrook, with haul roads and plant across the site

Our projects.

Critical infrastructure delivered end to end across Western Australia.

Critical infrastructure delivered end to end across Western Australia. Water, power, gas pipeline, fabrication and civil projects for utilities, mining and resources, oil and gas and land development, with the same capability ready for defence.

Drone view of the cleared and levelled Butler subdivision site beside the rail line and a main road, with plant working across the pad

Butler Civil Works, Lot 1757 Fintona Crescent

DevelopmentWA

Civil, Water, PowerLand Development

Subdivision civil works beside occupied homes, from earthworks and sewer to water and Western Power reticulation and roadworks.

Two Benang workers laying orange cable protection over the trench inside the live Western Power substation at Henderson

HV Cable Into A Live Substation, Henderson

Western Power

PowerUtilities

Around 2,240 metres of high voltage cable with rail under-bores, delivered across three Western Power outages.

A green high voltage kiosk substation being craned onto its concrete plinth at Morley Road, Bullsbrook

End-to-End Power Connection, Bullsbrook

Western Power

PowerUtilities

Around 10 km of underground power cable with HV switchgear and metering, tested and commissioned around live outages.

A high voltage transmission tower at dusk with glowing orange power lines streaming from it

Western Power Network Support Services

Western Power

PowerUtilities

Cable laying, HDD, dry-vac excavation and substation works under the Western Power Network Support Services Program.

Benang directional drilling truck with conduit ducts on the Rottnest Island power upgrades

Rottnest Island Power Upgrades

Rottnest Island Authority

PowerUtilities

Island electrical infrastructure upgrades with underground cables installed by horizontal directional drilling.

Generator and trenched conduit runs on the low voltage power installation at Cloudbreak

Chichester Bigge Farewest LV, Cloudbreak

Fortescue, via TCD Civil Construction

PowerMining & Resources

2,870 metres of LV distribution cabling across 32 runs on an active Pilbara mine site.

Prefabricated data centre building craned into position at Solomon Hub

Solomon Data Centre

Fortescue

Civil, PowerMining & Resources

Full civil to commissioning data centre build delivered in a 10 week programme.

Work with us

Ready to discuss your project?

Our team is ready to help. Whether you are scoping a tender, planning a build, or exploring multi-utility delivery, get in touch.

Projects | Benang