Chichester Bigge Farewest LV

Cloudbreak Mine Site, Western Australia
Dec 2022 (16 weeks)

Scope

Service location, survey, and soil testing.

Decommissioning of existing generator connections, Supply, and installation of Thirteen (13) direct buried LV underground power distribution cabling sections (final locations of conduits to be confirmed by Site personnel) from Pole DB to Bore Pump DB, including earth works and conduit supply. Cabling distance scheduled as 1,600 metres.

Supply and installation of nineteen (19) above ground catenary cabling sections & UG sections from Bore Pump DBs to Bore Pumps and kiosk transformer to Bore Pumps, including installation of star pickets.

Cabling distance scheduled as 1270m.

Testing and verification of the works.

Peak Personnel: 20
ATSI participation: up to 10%
No Lost Time Injuries
Zero environmental incidents